NSC Site Inspection, Pre-sliding – 17 November 2016.

50052

NSC (New Safe Confinement) Arch, pre-sliding visit with EBRD (European Bank of Reconstruction and Development), Chernobyl – 17 November 2016.

1. Inspecting the transfer system, pre-sliding – 17 November 2016
Mammoet Sliding System NSC Chernobyl - Addington-Barker
2. Inspecting the transfer system, pre-sliding – 17 November 2016
Mammoet Sliding System NSC Chernobyl - Addington-Barker
3. Inspecting the transfer system, pre-sliding – 17 November 2016
MCS NSC Chernobyl - Addington-Barker
4. MCS (Main Crane System, configured in the centre, for sliding over the OS – 17 November 2016.
MCS NSC Chernobyl - Addington-Barker
5. MCS (Main Crane System, configured in the centre, for sliding over the OS – 17 November 2016.
6. NSC East Arch interface with the OS housing the destroyed Reactor 4 background – 17 November 2016.
7. NSC East Arch interface showing tilting panels – 17 November 2016.
Pre-sliding group photo, left to right, Alexander Slavis (EBRD) Anthony Addington-Barker (MC) Irina Velichko (Novarka HSE), Simon Evans (EBRD), Colin Ross (MC)
Pre-sliding group photo, left to right, Alexander Slavis (EBRD) Anthony Addington-Barker (MC) Irina Velichko (Novarka HSE), Simon Evans (EBRD), Colin Ross (MC) – 17 November 2016.

Other References:

  1.  Chernobyl’s New Safe Confinement
  2.  NSC, Chernobyl Mega Project