ISF2 Site Inspection – 3 September 2014.

6570

ISF2 Site Inspection with EBRD and AMEC – 3 September 2014.

1. ISF2 Structure at site takeover – 3 September 2014.
2. ISF2 Structure at site takeover – 3 September 2014.
3. ISF2 Structure at site takeover – 3 September 2014.
4. ISF2 Structure at site takeover – 3 September 2014.
ISF2 Structure at site takeover – 3 September 2014.
5. Hard Standing Area – 3 September 2014.

Other Reference:
1.  Final testing of Chernobyl used fuel store.
2.  Decommissioning the Chernobyl Nuclear Power Plant
3.  Process of SNF transportation from the existing storage facility into ISF-2

ISF-2  –   Interim Spent [nuclear] Fuel [Storage] Facility 2.
SNF    –   Spent Nuclear Fuel
DWC   –   Double Wall Canister
CSM    –   Concrete Storage Modules