Main Crane System (MCS) NSC, Pre-Lifting – 26 & 27 August 2015.

51075

MCS (Main Crane System) – NSC (New Safe Confinement) Arch, pre-lifting visit with EBRD (European Bank of Reconstruction and Development), Chernobyl – 26 & 27 August 2015.

Addington-Barker
1. Main Crane System (MCS) NSC Arch, Chernobyl – Pre-lifting.
Main Crane System, (MCS) at the NSC in Chernobyl, before lifting
2. Main Crane System, Chernobyl – Pre-lifting.
Main Crane System, (MCS) NSC in Chernobyl, before lifting
Main Crane System (MCS), Chernobyl – checks following assembly – Pre-lifting.
Main Crane System, (MCS) NSC in Chernobyl, before lifting
Main Crane System, (MCS), Chernobyl, showing  one of the carriage units- Pre-lifting.