ISF-2 Project Site Inspection and Survey – 3 September 2014.

52249

ISF-2 site inspection, structure and hot cell survey with EBRD and AMEC at site takeover – 3 September 2014.

1. ISF-2 facility structure at site takeover – 3 September 2014.
2. ISF-2 facility survey at site takeover – 3 September 2014.
3. ISF-2 site and facility survey at site takeover – 3 September 2014.
4. ISF-2 site and facility survey at site takeover – 3 September 2014.
5. ISF-2 site and facility survey at site takeover – 3 September 2014.
6. Andrey Savin inspecting the hard standing area and the ISF-2 Facility – 3 September 2014.

Further information:
1. Final testing of Chernobyl used fuel store.
2. Decommissioning the Chernobyl Nuclear Power Plant
3. Process of SNF transportation from the existing storage facility into ISF-2