NSC Arch Site Inspection – 19 September 2013.

71139

New Safe Confinement, NSC Arch, site inspection with EBRD (European Bank of Reconstruction and Development), Chernobyl, 19 September 2013.

1. New Safe Confinement, NSC Arch, site inspection, Chernobyl, 19 September 2013.
2. NSC Arch assembly, showing annular space – 19 September 2013.
3. NSC Arch assembly, showing annular space – 19 September 2013.
4. Turbine Hall centre right, above centre, old and new Vent Stacks – 19 September 2013.
5. Looking through the Arch suspension cables, with the old and new Vent Stacks background – 19 September 2013.
6. NSC Arch Connection – 19 September 2013.
7. Mobile Crane with Reactor 4 building, and Vent Stacks, in the background beyond the Shielding Wall – 19 September 2013.
8. Anthony Addington-Barker, with Object Shelter, Shielding Wall and Reactor 4 background – 19 September 2013.

Further information:
1. Chernobyl’s New Safe Confinement
2. NSC, Chernobyl Mega Project
3. NSC site visit 
Abbreviations, Terms & Acronyms – NSC Arch, Chernobyl.
NSC  –   New Safe Confinement.
OS    –   Object Shelter 
ChNPP   –   Chernobyl Nuclear Power Plant
MCS    –   Main Crane System